DIMENSIONS | |
Tare  Weight | 11000kg |
Payload | 50000kg |
Overall  Length | 10205mm |
Overall  Width | 2448mm |
Overall  Height | 3590mm |
Wheel Track | 1840mm |
Wheelbase | 4140+1360+1360mm |
DUMPERÂ BODY | |
Volume | 30CBM |
Inner Dimension | 8500x2300x1600mm |
Side Thickness | 6mm / Q345B |
Bottom Thickness | 8mm / Q345B |
SPECIFICATION | |
Main  Frame | Heavy duty and extra durability designed; Opting for high tensile steel Q345B, welding by automatic Submerged-Arc processes 500mm Height "I" beam, Top Flange 16mm,width 140mm; Middle Flange 8mm; Bottom Flange 16mm,width 140mm |
Axle | 3 units of HO'S-12T axle |
Suspension | A couple of German design mechanical 3-axle suspension HO'S brand |
Leaf Spring | 6 sets of reliable local brand, 13-piece leaf spring, 11x100mm |
King Pin | One unit of 3.5" standard bolt-in kingpin |
Landing Gear | Two-speed, manually operating, heavy duty JOST D200 landing leg |
Wheel Rim | 13 units of 9.00-22.5 rim,SUNRISE brand |
Tire | 13 units of 12R22.5 tire,AAA brand (one unit for spare use) |
Spare Wheel Carrier | One set of spare wheel carrier including a riser |
Pneumatic Braking System | Two units of WABCO RE 4 relay valve; four units of T30/30 spring brake chamber; two units of T30 brake chamber, two units of reliable local brand 45L air tank; two units of reliable local brand standard coppery air-connector. |
Electrical  System | One unit of JAEGER POWAY, 24V 7-pin ISO 1185 socket; tail lamp with turn signal, brake light & reflector,  side lamp etc. One set of DAFA (brand) 6-core standard Cable. |
Painting | Sand blasting processing clean rust; One coat of anticorrosive primer; Two coats of finish urethane paint; Color as customer choice |
Tipper Cylinder | HYVA FC196-5-07300 |
DIMENSIONS | |
Tare  Weight | 11000kg |
Payload | 50000kg |
Overall  Length | 10205mm |
Overall  Width | 2448mm |
Overall  Height | 3590mm |
Wheel Track | 1840mm |
Wheelbase | 4140+1360+1360mm |
DUMPERÂ BODY | |
Volume | 30CBM |
Inner Dimension | 8500x2300x1600mm |
Side Thickness | 6mm / Q345B |
Bottom Thickness | 8mm / Q345B |
SPECIFICATION | |
Main  Frame | Heavy duty and extra durability designed; Opting for high tensile steel Q345B, welding by automatic Submerged-Arc processes 500mm Height "I" beam, Top Flange 16mm,width 140mm; Middle Flange 8mm; Bottom Flange 16mm,width 140mm |
Axle | 3 units of HO'S-12T axle |
Suspension | A couple of German design mechanical 3-axle suspension HO'S brand |
Leaf Spring | 6 sets of reliable local brand, 13-piece leaf spring, 11x100mm |
King Pin | One unit of 3.5" standard bolt-in kingpin |
Landing Gear | Two-speed, manually operating, heavy duty JOST D200 landing leg |
Wheel Rim | 13 units of 9.00-22.5 rim,SUNRISE brand |
Tire | 13 units of 12R22.5 tire,AAA brand (one unit for spare use) |
Spare Wheel Carrier | One set of spare wheel carrier including a riser |
Pneumatic Braking System | Two units of WABCO RE 4 relay valve; four units of T30/30 spring brake chamber; two units of T30 brake chamber, two units of reliable local brand 45L air tank; two units of reliable local brand standard coppery air-connector. |
Electrical  System | One unit of JAEGER POWAY, 24V 7-pin ISO 1185 socket; tail lamp with turn signal, brake light & reflector,  side lamp etc. One set of DAFA (brand) 6-core standard Cable. |
Painting | Sand blasting processing clean rust; One coat of anticorrosive primer; Two coats of finish urethane paint; Color as customer choice |
Tipper Cylinder | HYVA FC196-5-07300 |
Coupling Transform Project: The energy saving transformation has mentioned the coupling from 200-600MW, including all kinds of Voith couplings from German, for example, R15K551.1, R15K550, R17K.2E, R16K400M, R18K500, and Ebara couplings from Japan, for example GCH104-47A. And mentioned various kinds of booster pumps, for example, YNKN300/200J, FA1D56A, YNKN350/250J, YNKN400/300L, YNKN300/200-20B, SQ300-670, YNKN300-200J KSB, FA1D56G....
Until now, we have finished energy saving transformation for more than 20 power plants both domestic and abroad, the earliest Ningxia Maliantai Power Plant has already energy saving operated for 6 years.
If you have any questions, please contact us directly. Welcome to our factory in Shenyang, China.
Coupling Transform Project
Coupling Transform Project,Energy Saving Project,Energy Saving Transformation Project,Couplings for Power Plant
Shenyang German Machine Hydraulic Transmission Machinery Co., Ltd. , http://www.hcouplingc.com