Precautions before and after work on high and low temperature aging test boxes

Dongguan Kewen Testing Equipment Co., Ltd. is a manufacturer of environmental testing equipment for R&D, production, and sales. The company has a strict management system. Every equipment must be strictly debugged and inspected before shipment to ensure smooth access to customers' locations. . The high and low temperature aging test chamber has a large volume. Therefore, the customer must pay attention to the following matters before starting the work each time, so as to upgrade or facilitate other operations during the subsequent use.

as follows:

The detection steps generally include the following five points:

First, confirm whether the power cord of the high and low temperature aging test box is properly installed and properly grounded according to the specifications.

Second, to confirm whether the high and low temperature aging test chamber water is enough and the cover of the water tank is properly covered and cleaned?

Third, confirm the high and low temperature aging test box wet ball gauze:

a、Whether the wet ball special gauze is placed in the correct position? (Is it placed in front of the humidity sensor?)

b. Is it wet? (Water is provided in the water tank. If the water level is normal, the gauze cannot be wetted. Please change the new gauze immediately. Change the gauze every three months.)

c. Is the water tank normal?

Fourth, confirm the high and low temperature aging test box humidifier working conditions:

a, humidifier water level is normal? (Check the water level 3 to 5 minutes after the humidifier has supplied water)

b. Is the water used during the humidification period clean? (Humidifier should be drained regularly to keep the inside clean)

c. Is the drain properly installed?

Fifth, high and low temperature aging test box Check wet bulb over temperature protection switch is set at 150 °C.

Note: The gauze should be removed only when the temperature test is done. If the gauze is operated at a high temperature above 85°C, the gauze should be replaced before the next run.

 Air To Air Waste Heat Recovery Equipment


Waste heat recovery equipment is a kind of metal plate heat exchanger, where the air pass

through and exchange energy(heat-recovering system and exhaust heat recovery system). It can separate fresh air and exhaust air completely, avoided

any solvent transmission. The two air cross and counter flow to the exchanger, then fresh

air and exhaust air exchange energy through the metal plate,

collisions between particles in the hot inner region transfer energy to particle

s in the cooler outer region and realize to recycle energy from exhaust air.
Specifications
Modular construction
Compact structure
Dust prevention

No heat transfer medium

Air to Air Waste Heat Recovery Equipment

Air to Air Waste Heat Recovery Equipment

Air To Air Waste Heat Recovery Equipment,Waste Heat Recovery Machine,High Efficiency Waste Heat Recovery Equipment,Waste Hot Air Recovery Machine

Dalian Transen Technology Co.,Ltd. , http://www.transen-china.com