Submersible Pump Emergency Shut-off Valve

Model NO.: 1.5inch, DN40
Origin: Wenzhou, Zhejiang, China
HS Code: 8481804090
Emergency Shut-off Valves are installed on fuel supply lines beneath dispensers at grade-level to minimize hazards associated with collision or fire at the dispenser. If the dispenser is pulled over or dislodged by collision, the top of the valve breaks off at the integral shear groove, activating poppets and shutting off the flow of fuel. Single-poppet models shut off supply flow.Double-poppet models shut off supply as well as prevent release of fuel from the dispenser's internal piping.
Technical Specification&Package Date:
 
Working Pressure 0.2mpa
Body Cast iron
Valve closing speed 0.5s
Working temperature -30°∼55° 
Flow Qange 0-120L/min
Poppet Valve Single/double
Inlet&Outlet BSPF/NPT 1.5"
Thread Male /Female
Dimension 41*35*25cm
Net weight 25KG
Gross Weight 26KG
Package 10pcs/CTN

Product Display
 
Features:
1,Used for gasoline,kerosene,diesel oil ect
2,It is obligatory in the installation of fuel supply kits that are equipped with a submersible pump.
3,This valve is installed on the fuel supply lines to minimize hazards associated with accidental collision or fire.
4,This valve stops the fuel flow.
5,When this valve works, this is separated in two halves, closing the fuel piping.
Packaging & Shipping
Exhibition Photo
 
Company Information
 
Our Services
1.Most Competitive Price
We are manufacturer,We sell products direct to customers instead of through middleman.We save evry penny for you.
2.Quality Guarantee.
With proffessional team control the produce process,guarantee the high quality.
3.Design and Production.
If you are in special demands, just send us the design paper or products parameter,we will design and manufacture it for you.
4. Faster Delivery.
Since we are a factory with large warehouse,we have abundant products in store.
5.After-sale Service
Timely and effective.
 
FAQ
1. What is your terms of packing?
A: we pack our goods in neutral white boxes and brown cartons. 
2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. 
3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
4. How about your delivery time?
A: It will take 5-10 days after receiving your advance payment.
5. What is your sample policy?
A: We can supply the sample, but the customers have to pay the sample cost and the feight cost.
6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
7: How do you make our business long-term and good relationship?
We keep good quality and competitive price to ensure our customers benefit . We respect every customer as our friend and we sincerely do business and make friends with them.

Main Production Pipe Equipment

Plastic Extruder Feeder,Main Production Pipe Equipment,Medical Stereo Stacker,Textile Three-Dimensional Stacker

Jiangyin Lingji Automation Equipment Co., Ltd. , https://www.lingjimachine.com