What are the influencing factors of gold cyanide leaching?

Cyanide gold extraction method is one of the main methods for extracting gold from gold mines. The explanation of the mechanism of cyanide on the dissolution of gold is still inconsistent. Most people think that in the presence of oxygen in the cyanide solution of gold, a gold complex can be formed and dissolved. The basic reaction formula is:

It is generally believed that gold is cyanide dissolved in a two-step reaction:

The surface of the gold is gradually dissolved in the surface and in the cyanide solution, and the concentration of oxygen in the solution is related to the dissolution rate of gold.

The factors affecting the leaching rate of gold during cyanidation are: the concentration of cyanide and oxygen, the pH value of the slurry, the raw material properties of the gold mineral, the leaching temperature, the slime content, the slurry concentration and the leaching time.

The cyanide concentration during leaching is generally 0.03% to 0.08%, and the dissolution rate of gold rises linearly to the maximum with increasing cyanide concentration. Then slowly rise, when the cyanide concentration reaches 0.15%, the dissolution rate of gold is independent of cyanide concentration, and even decreases (due to cyanide hydrolysis).

The dissolution rate of gold increases with increasing oxygen concentration, and the dissolution of gold can be enhanced by an oxygen-enriched solution or high-pressure aeration cyanidation.

Ability to dissolve gold and silver cyanide as reagent: ammonium cyanide> calcium cyanide> sodium> hydroxide. The price of potassium cyanide is the most expensive. Most of the current use of sodium cyanide, the consumption of cyanide depends on the nature of the material and the operating factors, often 20 to 200 times the theoretical amount.

The nature of the material affects the leaching rate of gold. Although cyanidation is the main method of extracting gold, gold-bearing ore, but some material not directly employed cyanidation process, if the copper in the ore, arsenic, antimony, bismuth, sulfur, phosphorus, a magnetic iron ore, iron ore and other white When the content of the component is high, the cyanide consumption or the oxygen in the slurry is greatly increased, and the gold leaching rate is lowered. When the ore contains high carbon, the carbon will adsorb the dissolved gold and lose with the tailings. The pre-oxidation roasting or flotation method can remove the harmful impurities.

The hydrolysis of cyanide is:

Therefore, toxic HCN is volatilized; lime is added to weaken the cyanide hydrolysis, and the above reaction proceeds to the left to reduce the chemical loss of cyanide. Lime also neutralizes the action of acid substances, and can precipitate harmful ions in the slurry, so that the dissolution of gold is in the best condition, and lime is commonly used as a protective base. The amount of lime added is such that the pH of the slurry reaches 11 to 12, and the pH of the slurry is too high, which is unfavorable for the dissolution of gold.

The size of the gold particles mainly affects the cyanide time, and the dissolution rate of the coarse gold (>74 microns) is slow. Therefore, it is reasonable to pre-recover coarse gold by amalgamation , re-election or flotation before cyanidation. The dissociation of fine gold particles from the monomer during the grinding process is still an important factor in increasing the leaching rate of gold.

The mineral content and slurry concentration during cyanide directly affect the diffusion rate of the components. The concentration of pulp should be less than 30% to 33%. The concentration of slurry should be less than 22% to 25%, but the concentration should not be too low, otherwise the consumption of cyanide will increase.

The cyanide time varies depending on the nature of the material, the cyanidation method and the cyanide conditions. Usually stirred cyanide leaching often greater than 24 hours, sometimes up to 40 hours, 72 hours required when cyanide gold telluride, diafiltration cyanide leaching takes more than 5 days.


The Lever Hoist is made of high strength low carbon alloy steel,high elastic spring with double pawl brake system design featuring stable operation and smooth braking.


It is all significant for improving the security and dependability of the braking system through designing dust cover of braking system.

 

Within auto-clutch,worker can handle the Load Chain with one hand when there is No-Load.

 

We design sealed guide chain construction to ensure the load chain running safely.

 

The top and bottom hook are made of forged high strength alloy, accomplished by heat treatment process. The hooks also have three stretch indicators. However if by any chance the hook is overloaded there is no fear of it breaking, it will simply gradually start straightening out, avoiding any load drop or personal injury.

Precision cast steel latch in bottom hook with embedded design can prevent the bottom hook off effectively.

 

The stainless steel cap nuts on shell of the hoist protect the screw from various injuries of exposed outdoor for long time and severe chemical environment. This design is also simple to disassemble, easy to maintain

 

Every Huaige brand hoist individually proof load teat to 1.5WLL with individual serial number.

 

MBL of 400% of  WLL.

 


Meeting requirement of EN13157

 

If the handle is locked under a shock load, the lock-releasing mechanism acts to set the handle free to move.


Products Show:

1



FAQ:

What is our factory product range?

1) We are specialize in chain block, lever block, Electric Hoist, Webbing Sling, cargo lashing,

Hydraulic Jack, forklift, mini crane, etc.

2) Hoist Accessories: Load chain, wire rope, Rigging , hook ,pulley and shackles.

How to order the products? 

Send the inquiry with detail item description or with ITEM number. Tell us the quantity you need, the size of goods, and the packing. 

If there is no packing demand we take it as seaway packing. 

If possible please attach one reference picture to avoid any misunderstanding or any links from our website for we get a better understanding.

About sample:
Cost with free if the quantity small, and the express charge account into buyer`s.

About payment:
T/T, LC in U.S. Dollars or EUR, for small orders, PayPal is ok.

About lead time:
Cause all of our products manufacturer according customers order, 

usually within 35-40 days after receipt of your deposit.

How Will My Order Be Shipped?
Usually shipped by sea, small order or urgent order can by air or by courier after received your agreement. 

How long does it take to receive my order?
According the distance from China to your port. Usually from China to European about 22 days. 

To West of American 20 days. To Asia 7 days or more.

To Middle East more 30 days.

By air or by courier will be faster, within 7 days.
About mini order:
Different products with different limited, please contact us to confirm.

What's your quality guarantee?

We have different kinds of products which can meet different quality standard.

YANFEI QC department will teset products before shipping. We have 100% quality guarantee to customers. We will be responsible for any quality problem.

What's benefit will you bring?

Your client satisfied on the quality.

Your client continued orders.

Your can get good reputation from your market and obtain more orders.

 VL lever block

6T lever hoist



 

Manual Lever Hoist

Manual Lever Hoist,Hand Lever Hoist,Manual Lever Block,Manual Chain Lever Hoist

Hebei Liston Lifting Rigging Manufacturing Co., Ltd. , https://www.liftingriggingfactory.com