The extraction process is as follows:
1. Preparation of active zinc oxide: oxidized ore - pulverization - extractant leaching - filtration - impurity removal - decomposition and recovery of extractant - drying - roasting - pulverization - active zinc oxide finished product;
2. Advanced zinc powder: Oxidized ore - crushing - extractant leaching - filtration - decomposition and recovery of extractant - drying - high-grade zinc fine powder; the specific process is as follows: the mineral powder and the desired extraction The agent is added to the stirring tank, and after being fully stirred, it is input into the reaction tank, and is fully stirred by a stirrer provided on the reaction tank, and the test is performed once every 1 hour, and the mixture is continuously stirred for 3 hours. After the extraction rate reaches 90%, the reaction is formed. The metal solution is input into the liquid storage tank, and then the metal solution is self-flowed from the liquid storage tank into the decomposition tank to be heated to boiling. When the metal solution becomes colorless and transparent, the heating is stopped, the metal solution is filtered, and dried. The metal oxide is obtained by electrolysis to obtain the metal.
Mobile 3D Wheel Alignment is fit for a variety of venues and multi-station. Mobile 3D Wheel Alignment is all-round machine, without calibration. Mobile 3D wheel alignment has 3 cameras, it supports multi-screen display. all data can be shown on LCD, cell phone with android system and tablet PC simultaneously. Mobile 3D wheel alignment is movable. It do not need installation and calibration.
*Related Products:Easy 3D Wheel Alignment,No Installation Wheel Alignment,No Calibration Wheel Alignment.
Mobile 3D Wheel Alignment
Mobile 3D Wheel Alignment,Two-Post Wheel Alignment,Stable Mobile 3D Wheel Aligner ,3D Wheel Alignment, Portable 3D Wheel Alignment, Movable Wheel Alignment
Shenzhen Sucvary Tech Co., Ltd. , https://www.syalignment.com