Flotation post safety operation procedures

(1) Driving:

(1) Check whether the inlet and outlet pipes are leaking, blocking, or flushing with water.

(2) The debris in the agitation tank and flotation tank should be removed first.

(3) The transmission belt is suitable for tightness, the foam scraper is flexible, the foam channel is leaky, the water supply pipe is provided, and the valve is good.

(4) The lubrication point is in good condition and the safety shield is stable.

(5) Start the sorting machine in the order of coarse and fine 1 to 6, and then feed the machine before feeding.

(two) operation

(1) During operation, the impeller bearing temperature is less than 65 degrees, and the belt is worn tightly.

(2) Pay attention to the foam, prevent the trough, run the mine, the liquid level is suitable, and the float liquid level is stable.

(3) The dosage should be strictly enforced, and the additional water should not be too large to remove foreign matter in the tank.

(3) Parking: Stop feeding, stop after running for a period of time, rinse the concentrate and tailings pipeline after parking.

Blank Flanges

* Plate FLANGE (Plate Flange, Flat Flange, Plain Flange)
* SLIP ON FLANGE (SORF SOFF FLANGE)
* WELDING NECK FLANGE (WNRF FLANGE)
* BLANK FLANGE (BLIND FLANGE, BLFF FLANGE, BLRF FLANGE)
* THREADED FLANGE (SCREWED FLANGE)
*BACKING RING FLANGE

Blank Flanges,BS4504 Blank Flange,DIN 2527 Blank Flanges,Steel Blank Flanges